Work
completed this week, June 24th to July 1st
·
Installed colored and stamped concrete on east
side of Tower Drive from Navy Blvd. to Aviator Lane
·
Installed colored and stamped concrete in a few
miscellaneous areas previously not installed
·
Installed concrete sidewalk on south side of
Sable Drive
o
Including Von Maur entrance
·
Installed concrete sidewalk along Aviator Lane,
east of Tower Drive on lower level of retaining wall
·
Install concrete sidewalk at miscellaneous
locations along the project site that were previously removed.
o
South east corner of Aviator Lane and Tower
Drive, within South Park Area
o
South east corner of Navy Blvd and Tower Drive,
near State & Main Bar & Grill
o
Miscellaneous areas along Navy Blvd
·
Installed topsoil in planter beds
·
Asphalt patching in front of previously replaced
concrete curb & gutter
·
Continued with installation of irrigation
piping.
·
Continued with installation of electrical
conduit and wiring for street lighting and accent lights.
·
Perform general site clean-up in preparation for
July 4th Holiday
o
Install temporary stone within areas of concrete
sidewalk that were not poured
o
Swept project site
o
Removed unnecessary barricades and fencing
o
Removed stockpiles and debris
·
All outdoor seating along Tower Drive is
accessible during the July 4th Holiday
o East
side of Tower Drive from Aviator Lane to Navy Blvd – Remaining orange
construction fencing removed
o East
side of Tower Drive from Navy Blvd to Valor Drive – Existing sidewalk still
in-place
o West
Side of Tower Drive – Patio seating has been available for several weeks
Construction
activity scheduled for next week, July 4th to July 8th
·
No work on-site July 4th Weekend
·
Remove existing retaining wall on north side of
Valor Drive east of Tower Drive
·
Install new retaining wall on north side of
Valor Drive east of Tower Drive
o
Businesses will be provided temporary access
during construction. Thank you in advance for your patience and understanding.
We will do everything possible to ensure access is provided throughout the day.
·
Concrete sidewalk removal and replacement along
north side of Sable Drive
Anticipated work in future weeks:
·
Week of July 11th
o
Removal and pouring of concrete sidewalk
adjacent to the buildings on the east side of Tower Drive from Valor Drive to
Navy Blvd
§
This will be the final major phase of concrete
removal and replacement for the project.
§
Anticipate to complete this section of
streetscape prior to Arts Festival on August 5th
o
Removal and pouring of concrete sidewalk on
northwest corner of Tower Drive and Sable Drive, near Eggsperience.
·
Early September
o
Landscape restoration with new trees and
perennials in the planting beds.
o
Due to move favorable growing conditions
Friendly
Reminder:
·
No work will be performed over July 4th
Holiday Weekend!!!
·
All businesses are open during construction!
·
Surface parking spots are limited. Parking in
garages is strongly encouraged.
Have a safe and enjoyable July 4th Holiday
Weekend!!!!