Continued to install electrical conduits for
street lighting and tree accent lights, and irrigation piping on west side
of Tower Drive from Aviator Lane to Valor Drive.
·
Began installing curbing for planter
beds behind concrete curb & gutter on the north and south side of Navy
Boulevard.
·
Poured
standard concrete between curb & gutter and previously installed sidewalks
along Tower Drive from Aviator Lane to Wolverine Drive, excluding stamped and
colored concrete.
·
Concrete poured at select locations on the west
side of Tower and Navy Boulevard.
Construction activity beginning May 23rd:
·
Standard concrete will continue to be poured on
the west side of Tower Drive from Aviator Lane to Wolverine Drive, from the new
sidewalk to the curb and in planting beds, excluding locations where stamped and
colored concrete will be installed.
·
Stamped and concrete installation along west
side of Tower Drive from Aviator Lane to Wolverine Drive. Once the stamped
concrete is set, the temporary fence will be removed and the full sidewalk will
reopen.
·
From Wolverine Drive to Valor Drive on the west
side of Tower, continue concrete framing and installing new curb in preparation
for standard concrete to be poured.
·
Installation of electrical conduits and
irrigation piping continues followed by pouring white concrete on the north and
south side of Navy Boulevard.
·
North side of Aviator from Tower (east) to
Patriot: Begin sidewalk and ramp/staircase removal. The doors to Ra Sushi on
Aviator Drive will be closed; customers will gain access to Ra Sushi using the
patio doors located on Patriot Boulevard.
o
Sidewalk on the north side of Aviator will also
be closed. Pedestrians will be rerouted to use the sidewalk along the south
side of Aviator Drive.
·
Standard concrete to be poured on the west side
of Tower Drive from Wolverine Drive to Valor Drive, followed by the
installation of stamped and colored concrete. Once the stamped and colored concrete
is set, the temporary fence will be removed and the full sidewalk will
reopen.
Please note:
·
The contractor will begin work on Saturdays starting
at 8:00 AM.
Friendly
Reminders:
·
Please use caution in the construction zone.
·
All businesses are open during construction!
Pedestrian walkways are provided at each door front for easy access.
·
Visitors of the Glen Town Center are encouraged
to use the parking garages. There is ample parking in the garages, which are
easily accessible by following the parking garage access
signs.