Work completed this week, August 15 to August
19:
-
Completed pouring concrete throughout the project site.
- Finished installing planter beds on Navy Boulevard.
- Installed topsoil in planter beds to prepare for landscape work.
- Ongoing electrical and irrigation work.
- Install railing at the retaining wall on Aviator Drive.
- Finish installing irrigation system and electrical throughout project site.
- Begin landscape work – installation of trees and shrubs.
- Install outdoor furniture including trash cans and benches.
- Finalize repairs on retaining walls on Valor Drive and Aviator Drive.
- Seal stamped, colored concrete throughout project site.
- Finish caulking along buildings, doorways will be caulked after business hours.
-
Parking on surface spots throughout the Glen Town Center as landscape and outdoor furniture is delivered and installed. Parking in garages in strongly encouraged.
- All businesses are open during construction!