Work completed last week, April 18 to April 22:
  • Poured concrete sidewalk in various locations including portions of the south side of Sable Drive and several small locations on the west side of Tower Drive.
  • Began concrete sidewalk removal from existing curb & gutter to newly installed sidewalk on west side of Tower Drive from Aviator Lane to Valor Drive.
  • Began concrete curb & gutter removal and replacement on the west side of Tower Drive from Aviator Lane to Wolverine Drive.
  • Installed temporary power for streetlighting on the west side of Tower Drive from Aviator Lane to Valor Drive.


Work anticipated to be completed next week, April 25 to April 28:
 
  • The new sidewalk adjacent to the businesses will provide walkways and access to businesses.
  • Excavation and curbing installation for planting beds.
  • Installation of electrical conduits for streetlighting and tree accent lights in planter beds.
  • Installation of irrigation piping for planter beds.

Looking ahead:

  • Once improvements are complete on the west side of Tower Drive, improvements will begin on the east side of Tower Drive.
  • Parking in garages is strongly encouraged as street parking on Tower Drive will be limited.