- Removed and replaced vandalized concrete sidewalk along Valor Drive and Tower Drive
- Removed and replaced driveways to parking garages on north side of Sable Drive
- Poured concrete curb & gutter along Tower Drive
- Removed remaining sidewalk along Valor Drive east of Tower Drive
- Excavated for planter beds
- Installed concrete curbing around planter beds on Tower Drive and Valor Drive
- Removed concrete sidewalk along north side of Wolverine Drive
- Installed electrical conduit and lighting accessories along Sable Drive, Wolverine Drive, Tower Drive, and Valor Drive
- Installed irrigation conduits along Sable Drive, Wolverine Drive, Tower Drive, and Valor Drive
- Began installing irrigation piping and spray heads along Tower Drive
Construction
activity scheduled for next week, July 25th to July 29th
- Pour remaining concrete sidewalk along Tower Drive from Navy Blvd to Valor Drive
- Pour remaining concrete sidewalk along Valor Drive
- Pour stamped and colored concrete along Tower Drive and Valor Drive
- Install irrigation conduits along Sable Drive, Wolverine Drive, Tower Drive, and Valor Drive
- Install electrical conduit and lighting accessories along Sable Drive, Wolverine Drive, Tower Drive, and Valor Drive
Anticipated work in future weeks:
- Prior to Arts Festival on August 5th
- All concrete sidewalk previously removed will be replaced along Tower Drive, Valor Drive, Sable Drive, and Wolverine Drive
- Early September
- Landscape restoration with new trees and perennials in the planting beds - due to more favorable growing conditions
- All businesses are open during construction!
- Surface parking spots are limited. Parking in garages is strongly
encouraged.